Freyssinet, Inc. recently completed the lift of the new basket-handle bridge over Lake Barkley near the Land Between the Lakes National Recreation Area in KY. In addition to equipment supply, Freyssinet, Inc. alongside Hebetec Engineering, lead lifting and lowering operations to move the 2,500 Ton structure onto its bearings.
Award from the ACEC (American Council of Engineering Companies) for the Engineering Excellence Awards Competition for its participation on the Project I-35 Brazos River Bridge for which Freyssinet, Inc. provided the supply and installation of the stay cables.
In Portland, Oregon, Freyssinet recently completed work on the Willamette River Transit Bridge (WRTB), a cable-stayed bridge located at the heart of the city and designed to accommodate pedestrian, cyclist, bus and tramway traffic.